Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the all-in-one-seo-pack domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /nas/content/live/ebsrp/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-migrate-db domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /nas/content/live/ebsrp/wp-includes/functions.php on line 6121
Potrero Industrial Center | Equity Building Services

Industrial Projects

Potrero Industrial Center
Potrero Industrial Center

Potrero Industrial CenterSouth El Monte, CA

Acquired in 2018 for future development.  Site currently features 2 metal buildings, both leased.

  • Total Project Size:
    78,000 Sq. Ft.
  • # of Buildings:
    1
  • Clear Height:
    32'
  • Acres:
    3.48
  • Status:
    Cash flowing portfolio property